Interiors
Case 01
Hotel lobby
Design proposal and visualizations of the lobby, reception and bar area, coordinated with the building's technical solutions: lighting, HVAC and service runs integrated into the finishes.
Portfolio · selected projects
Technical installations, full building refurbishment and civil works in Spain and Croatia. Each case sets out the real scope of our work along with on-site execution images.
Interiors
Case 01
Design proposal and visualizations of the lobby, reception and bar area, coordinated with the building's technical solutions: lighting, HVAC and service runs integrated into the finishes.
Refurbishment
Case 02
Complete renovation of a seafront building: ceramic tile roof, façade cladding, window and door joinery, water drainage and interior finishes, with scaffolding over the promenade.
Installations
Case 03
Installation of heat-generation equipment, copper pipe distribution, vertical risers, manifolds and distribution units. Delivered with a tidy layout and maintenance access planned from the design stage.
Industrial
Case 04
Distribution units, automated thermal substations, multi-circuit systems and industrial boiler rooms with flue-gas exhaust ducts. Installations sized for continuous operation.
Exterior networks
Case 05
Installation of outdoor thermal units, manifold assemblies and buried networks integrated into the foundation. Coordinated with the structure so ducts and inspection chambers are resolved before concreting.
Interiors
Case 06
Substrate preparation, circuit laying, distribution through manifolds and corrugated protective conduits. Executed room by room with runs checked before pouring the mortar screed.
Civil works
Case 07
Plot setting-out, excavation, foundation base preparation, on-site concrete pumping and slab execution. The phase that governs the schedule and budget of everything that follows.
Team
Case 08
Qualified specialists with professional tools, work carried out with personal protective equipment and on-site technical diagnostics. Direct on-site control is what keeps committed deadlines on track.
Extended documentation